Week Two of Cisco UCS Implementaion Completed

Progress has been made!!

The first few days of the week involved a number of calls back to TAC, the UCS business unit, and various other Cisco resources without much progress.  Then on Thursday I pressed the magic button and all the sudden our fabric interconnects came alive in Fabric Manager (MDS control software).  What did I do? I turned on SNMP.  No one noticed that it was turned off (default state).    Pretty sad actually given the number of people involved in troubleshooting this.

This paragraph subject to change based on confirmation of accuracy from Cisco. So here’s the basic gist of what was going on.  We are running an older version of MDS firmware and the version of Fabric Manager that comes with this firmware is not really “UCS aware”.  It needs a method of communicating with the fabric interconnects to fully see all the WWNs.  The workaround is to use SNMP.   I created an SNMP user in UCS and our storage admin created the same username/password in Fabric Manager.  Of course having the accounts created does nothing if the protocol they need to use is not active.  Duh.

The screenshot below shows the button I am talking about.  The reason no one noticed that SNMP was turned off was because I was able to add traps and users without any warnings about SNMP not being active.  Also, take a look at the HTTP and HTTPS services listed above SNMP.  They are enabled by default.  Easy to miss.

.

.

With storage now presented, we were able to complete some basic testing.  I must say that UCS is pretty resilient if you have cabled all your equipment wisely.  We pulled power plugs, fibre to Ethernet, fibre to storage,  etc and only a few did times did we lose a ping (singular PING!).   All our data transfers kept transferring, pings kept pinging, RDP sessions stayed RDP’ing.

We did learn something interesting in regards to the Palo card and VMware.  If you are using the basic Menlo card (standard CNA), then failover works as expected.  Palo is different.  Suffice it to say that for every vNIC you think you need, add another one.  In other words, you will need two vNICS per vSwitch. When creating vNICs, be sure to balance them across both fabrics and note down the MAC addresses.  Then when you are creating your vSwitches (or DVS) in VMware, apply two vNICs to each switch using one from fabric A and one from fabric B.  This provides the failover capabilities.    I can’t provide all the details because I don’t know them, but it was explained to me by one of the UCS developers that this is a difference in UCS hardware (Menlo vs Palo).

Next up: testing, testing, and more testing with some VLANing thrown in to help us connect up to two disjointed L2 networks.

.

Advertisements

Time to order and Implement Cisco UCS

Monday was a good day for us.  City Council voted to move forward with our proposed UCS purchase.  Now the fun begins.  In no particular order:

Get all parts into our service catalog, generate the order, prep facilities, attend training, schedule services, schedule server migrations, soothe ruffled feathers, order forgotten items such as PDUs, celebrate, receive equipment, install equipment, test equipment, and many more.

Implementation couldn’t occur at more inopportune time since fiscal year is coming to a close.  Talk about lots of disruption, but I think we can manage it.  I know we will make mistakes.  I know we will have successes.  It’s all part of a day in the life….

I plan on writing about our implementation so look forward to some interesting reading, hopefully, starting in June.

Categories: cisco, Hardware refresh, UCS Tags: ,

Battle of the Blades – Part III

April 27, 2010 Leave a comment

So earlier on I posted that I would list our strategic initiatives and how they led us down the path of choosing Cisco UCS as our new server platform as opposed to HP or IBM blades.  Before I begin, let me state that all three vendors have good, reliable equipment and that all three will meet our needs to some degree.  Another item of note is that some of our strategies/strategic direction may really be tactical in nature.  We just sort of lumped both together as one item in our decision matrix (really a fancy spreadsheet).  The last item to note is that all facts and figures (numbers) are based on our proposed configurations (vendor provided) so don’t get hung up on all the specifics.  With that out of the way, let’s begin…

If we go way back, our initial plan was just to purchase more HP rack-mount servers.  I have to say that DL380 server is amazing.  Rock solid.  But given our change in strategic direction, which was to move from rack-mounts to blades, we were given the option of going “pie-in-the-sky” and develop a wish list.  It’s this wish list, plus some specific initiatives,  that started us down the path at looking at Cisco UCS (hereafter referred to as UCS).

Item one:  Cabling.  Now all blade systems have the potential to reduce the number of cables needed when compared to rack-mount systems.  Overall, UCS requires the least amount of cables outside of the equipment rack due to the fact that the only cables to leave the rack are the uplinks from the fabric interconnect.  With HP and IBM, each chassis is cabled back to your switch of choice.  That’s roughly 16 cables per chassis leaving the rack.  With UCS, we have a TOTAL of 16 cables leaving the rack.  Now you might say that a difference of 32 cables per rack (assume 3 HP or IBM chassis in a rack) might not be much, but for us it is.  Cable management is a nightmare for us.  Not because we are bad at it, we just don’t like doing it so less cabling is a plus for us.  We could mitigate the cable issue by adding top of rack switches (which what a fabric interconnect sort of is), but we would need a lot more of them and they would add more management points, which leads us to item two.

Item two:  Number of management points.  Unless you have some really stringent, bizarre, outlandish requirements the chances are that you will spend your time managing the UCS system at the fabric interconnect level.  I know we will.  If we went with HP or IBM, we would have to manage down to the chassis level and then some.  Not only is each chassis managed separately, think of all the networking/storage gear that installed into each chassis.  Each of those is a separate item to manage.  Great, let’s just add in X more network switches and X more SAN switches that need to be managed, updated, secured, audited, etc.  Not the best way to make friends with other operational teams.

Item 3:  Complexity.  This was a major item for us.  Our goal is to simplify where possible. We had a lot of back&forth getting a VALID configuration for HP and IBM blade systems.  This was primarily the fault of the very large VAR representing both HP and IBM.  We would receive a config, question it, get a white-paper from VAR in rebuttal, point VAR to same white-paper showing that we were correct, and then finally get a corrected config.  If the “experts” were having trouble configuring the systems, what could we look forward to as “non-experts”?

Talking specifically about HP,  let’s add in HP SIM as the management tool.  As our HP rep is fond of stating, he has thousands of references that use SIM.  Of course he does, it’s free!   We use it too because we can’t afford Openview or Tivoli.  And for basic monitoring functions, it works fine albeit with a few quirks.  Add in Blade System Matrix on top of it, and you have a fairly complex management tool set.  We spent a few hours in a demo of the Matrix in which the demoer, who does this every day, had trouble showing certain basic tasks.  The demoer had to do the old tech standby: click around until you find what you are looking for.

Item 4: Multi-tenancy.  We plan on becoming a service provider, of sorts.  If you read my brief bio, you would remember that I work for a municipal government.  We want to enter into various relationships with other municipalities and school districts in which we will host their hardware, apps, DR, etc and vice-versa.   So we need a system that easily handles multiple organizations in the management tool set.   Since we are an HP shop, we gave a very strong looksy to how HP SIM would handle this.  It’s not pretty.  Add in the Matrix software and it’s even uglier.  Now don’t get me wrong.  HP’s product offerings can do what they claim, but it not drag-and-drop to setup for multi-tenancy.

Item 5: Converged Architecture. When we made our initial decision to go with UCS, it was the only converged architecture in town.  I know we are not going to be totally converged end-to-end for a few years, but UCS gets us moving in the right direction starting with item 1: cabling.    All the other vendors seemed to think it was the wrong way to go and once they saw the interest out there, they decided to change direction and move toward convergence too.

Item 6: Abstraction:  You could also call this identity, configuration, or in UCS parlance, service profiles.  We really like the idea of a blade just being a compute node and all the properties that give it an identity (MAC, WWN, etc) are abstracted and portable.  It’s virtualization to the next level.   Yes, HP and IBM have this capability to but it’s more elegant with UCS.  It’s this abstraction that will open up a number of possibilities in the high-availability and DR realms for us further down the road.  We have plans….

So there you have it.  Nothing earth shattering as for as tactics and strategy go.  UCS happened to come out ahead because Cisco got to start with a clean slate when developing the product.  They also didn’t design it for today, but for tomorrow.

Questions, comments?